Se abre en una pestaña nueva

12.73MW Agrivoltaic Solar Project

12.73MW Agrivoltaic Solar Project
País
ItaliaItalia
ID del anuncio
L#20261228
Precio objetivo
Precio a consultar
Ingresos
Por definir
EBITDA
Por anunciar

Descripción

A 12.73 MWp agrivoltaic solar photovoltaic project located in the Lazio region of central Italy. The project covers approximately 20.32 hectares and is designed to combine renewable electricity generation with continued agricultural land use. Its technical configuration achieves a Land Occupation Ratio (LAOR) of 38.27%, remaining below the applicable 40% threshold. The project has reached a significant permitting milestone, with the simplified authorization procedure (PAS) completed through the administrative silence-assent mechanism, according to the documentation provided.

KEY PROJECT HIGHLIGHTS

  1. 01
    Installed Capacity12.73 MWp
  2. 02
    Total Land AreaApproximately 20.32 hectares
  3. 03
    Area Occupied by PV ModulesApproximately 14.30 hectares
  4. 04
    Land Occupation Ratio (LAOR)38.27%
  5. 05
    Specific Energy Yield1.40 GWh/ha/year
  6. 06
    Grid Connection AllocationApproximately €14,130 (excluding VAT)
  7. 07
    TechnologyAgrivoltaic solar PV

TECHNICAL OVERVIEW

The project features an agrivoltaic configuration designed to optimize land utilization while maintaining agricultural compatibility.

Key technical parameters include:

  • LAOR of 38.27%, below the 40% threshold indicated in the project documentation.
  • Specific energy yield of 1.40 GWh/ha/year, compared with the 1.07 GWh/ha/year agrivoltaic reference benchmark provided.
  • Compliance with the specified minimum agrivoltaic-to-standard photovoltaic productivity ratio of 0.60.

GRID CONNECTION

The project benefits from an allocated grid-connection cost based on the applicable Terna transmission network estimate.

  1. 01
    Total Standard Terna Grid Works Estimate€450,000
  2. 02
    Project Allocation Coefficient3.14%
  3. 03
    Allocated Grid Connection ContributionApproximately €14,130, excluding VAT
  4. 04
    Connection ConfigurationConnection via a new 150 kV electrical substation and associated connection infrastructure.

The proposed grid infrastructure includes a new 150 kV electrical substation and connection works associated with the existing transmission network.

PERMITTING & DEVELOPMENT STATUS

The project has progressed through the principal milestone of its simplified authorization procedure (PAS).

Milestone Status / Timeline
PAS application submitted 11 September 2026
Authorization perfected through silence-assent procedure 21 October 2026
Publication in the Official Bulletin of the Lazio Region Scheduled for 5 November 2026
Deadline to commence construction Within 18 months, subject to applicable TICA provisions and relevant contractual conditions
New 150 kV electrical substation Estimated construction period: 16 months
Grid connection works Estimated 8 months + 1 month per km

INVESTMENT RATIONALE

  1. 01
    Advanced permittingThe PAS procedure has reportedly reached completion through the silence-assent mechanism.
  2. 02
    Attractive project scale12.73 MWp of planned installed capacity.
  3. 03
    Agrivoltaic land-use efficiencyLAOR of 38.27%, within the stated regulatory threshold.
  4. 04
    Strong technical productivityProject-specific energy yield of 1.40 GWh/ha/year.
  5. 05
    Grid infrastructure planningDefined connection configuration and allocated grid-connection contribution.
  6. 06
    Strategic locationSituated in the Lazio region, Italy, within the country's established renewable energy market.

Datos clave

ID del anuncio
L#20261228
País
Italia
Sector
Energía renovable
Estado de la operación
Disponible
Precio objetivo
Precio a consultar
Ingresos
Por definir
EBITDA
Por anunciar
Múltiplo de ingresos
Por definir
Múltiplo EBITDA
Por definir

Asesoramiento M&A en el mercado medio – Deal Tombstones 2024

AsesorDeals
MergersCorp M&A International21
Keith Advisory17
GCG9
JP Morgan41
Jefferies23
Lazard26
Goldman Sachs30

Empresas en venta

Oportunidades similares